Works & Road Closures

Townsville City Council is committed to delivering well-maintained infrastructure and efficient transportation systems, with over $400 million being invested in roads and transport management, open spaces, water, and wastewater management this financial year.

This page contains works and road closures currently underway or planned on an interactive map. For a screen reader friendly list of all works and road closures, visit Works & Road Closures List View. For a list of current, upcoming and completed major projects visit the Current Projects page.

For State Government road works and closures, visit Queensland Government Traffic and Travel Information.

Disclaimer: Information should be used as a guide only. Dates and times relating to the works are estimates and may be impacted by weather and project conditions. Map pin locations are for illustration purposes only and may not represent the exact location of works.

Search by address

Recently Completed

Location Works Description
Mount View Dog Park, Kirwan Shade Structure Installation Installation of Shade Structure
409 Dalrymple Road, Mount Louisa Tree Removal Tree Removed
Riverway Lagoons, Thuringowa Central Safety Upgrade Works Installed fencing surrounding each lagoon and purpose-built lifeguard towers at key vantage points.
Ross River Dam, Kelso Ross River Dam Groundwater Monitoring System Upgrade Upgraded Ross River Dam Groundwater Monitoring System
Cambridge Street, Vincent Pathway Works Pathway Works undertaken
The Ring Road, Annandale - Deeragun Night Cleaning Completed night cleaning.
Lakeside Park, Kirwan Aquatic Weed Removal Removal of Aquatic Weed
Melton Terrace, Townsville City Roadworks Hamilton Street and Thorpe Street kerb and channel (gutters) and road treatments.
Jezzine Boardwalk, North Ward Jezzine Boardwalk Decking Upgrade Upgraded the Jezzine Boardwalk platform decking.
Marcel Street, Kirwan Roadworks Marcel Street kerb and channel (gutters) and road treatments.
Louisa Creek, Garbutt Environmental Restoration Removed and mulched woody weeds, stabilised bank and installed erosion control materials.
Hillside Crescent, Townsville City Top-City Reservoir Roof Removal Removal of Top-City Reservoir Roof
Riverway Drive, Kelso Ross Dam to Douglas Water Treatment Plant Pipeline Renewal Works Temporary Relocation of RV Dump Point Temporary Relocation of RV Waste Dump Point at Ross River Park.
Magnetic Street Creek Line, Picnic Bay and Yates Street Creek, Nelly Bay Environmental Restoration Removed and mulched woody weeds, stabilised bank and installed erosion control materials.
Hazelwood Court, Annandale Resurfacing Hazelwood Court road resurfacing.
Maconachies Road, Majors Creek Road Resurfacing Road Resurfacing Works.
Perkins Street, South Townsville Road Resurfacing Road Resurfacing work undertaken on Perkins Street Shoulder.
Horseshoe Bay Foreshore, Horseshoe Bay Coastal Recovery Reprofiled sand along identified sections that experienced erosion.
Hillside Crescent, Townsville City Top-City Reservoir Access Track Erosion Control Undertook Access Track Erosion Control
Ross River, Kelso Ross River Dam to Douglas Water Treatment Plant Dredging Completed Ross River dredging.